Language Technology at UiT The Arctic University of Norway

The Divvun and Giellatekno teams build language technology aimed at minority and indigenous languages

View GiellaLT on GitHub divvungiellatekno/giellalt.uit.no

Page Content

Meeting setup

Agenda

  1. Opening, agenda review
  2. Reviewing the task list from last week
  3. Documentation - divvun.no
  4. Corpus gathering
  5. Corpus infrastructure
  6. Infrastructure
  7. Linguistics
  8. name lexicon infrastructure
  9. Spellers
  10. Other issues
  11. Summary, task lists
  12. Closing

1. Opening, agenda review, participants

Opened at 12:34.

Present: Børre, Ilona, Sjur, Thomas

Absent: Risten, Per-Eric, Trond, Tomi

Agenda accepted as is.

2. Updated task status since last meeting

Børre

Ilona

Maaren

Per-Eric

Risten

Saara

Sjur

Thomas

Tomi

Trond

3. Documentation

InDesign documentation is needed.

TODO:

4. Corpus infrastructure

Nothing.

5. Infrastructure

TODO:

6. Linguistics

North Sámi

Hyphenation bugs found in Polderland code, update expected this week, should fix everything.

Ilona fixed the sme false negatives in bug 494.

Lule Sámi

Hyphenation: same as for sme.

TODO:

7. Name lexicon infrastructure

Delayed till Divvun2 (or after release of Divvun1).

Decisions made in Tromsø can be found in [this meeting memo.|/admin/physical_meetings/tromso-2006-08-propnoun.html]

TODO:

  1. fix bugs in lexc2xml; add comments to the log element (Saara)
  2. finish first version of the editing (Sjur)
  3. test editing of the xml files. If ok, then: (Sjur, Thomas, Trond)
  4. make terms-smX.xml <=== automatically from propernoun-sme-lex.xml (add nob as well) (the morphological section should be kept intact, in e.g. propernoun-sme-morph.txt) (Sjur, Saara)
  5. convert propernoun-($lang)-lex.txt to a derived file from common xml files (Sjur, Tomi, Saara)
  6. implement data synchronisation between risten.no and the cvs repo, and possibly other servers (ie the G5 as an alternative server to the public risten.no - it might be faster and better suited than the official one; also local installations could be treated the same way)
  7. start to use the xml file as source file
  8. clean terms-sme.xml such that all names have the correct tag for their use (e.g. @type=secondary) (Thomas, Maaren, linguists)
  9. merge placenames which are errouneously in different entries: e.g. Helsinki, Helsingfors, Helsset (linguists)
  10. publish the name lexicon on risten.no (Sjur)
  11. add missing parallel names for placenames (linguists)
  12. add informative links between first names like Niillas and Nils (linguists)

8. Proofing tools

Hunspell

Proper nouns not yet working, and they do not contain anything to clearly identify the end of the stem. This makes it harder to generate proper HUNSPELL entries.

TODO:

Testing

Spelling Error Markup

This will wait till after the release.

TODO:

Automated testing

Paradigm testing not yet working as expected.

TODO:

MS Office

Proofing tools do not work in Office 2003 when language is set to North Sámi (Finland/Sweden), and hyphenation doesn’t work in Office 2007 under the same circumstances. This is reported to Polderland, and a fix is expected soon.

Lexicon conversion to the PLX format

Open issues based on test results:

sámi-dáru - not accepted => Gen+hyph compound, is not allowed with hyphen. We can allow such compounds without too much overgeneration by adding the hyphen to the last part, ie -dáru in the PLX entry. => Bugzilla as feature request.

smj

sme

TODO:

InDesign tools

Almost finished, found a bug (reported to Polderland).

TODO:

Hyphenators

Waiting for the last bug fixes from Polderland.

Final release

Released!

Update

9. Other

Christmas vacation

who when
Børre away 20th, 21st, working from home on 27th, 28th
Ilona Not working: 22.-26.12. and 31.12.-4.1. (well, next year at all? My contract ends at 31.12.)
Per-Eric work some of the days in christmas, no vacation
Sjur 22-1, possibly working 27-28
Thomas 21-28
Tomi don’t know yet, work some days
Trond 24.12, 31.12. Work some of the days. Also prepare lectures at home…

Corpus contracts

Delayed till after final release.

TODO:

Bug fixing

When fixing bugs, record the version number containing the fix in the Bugzilla bug report, such that for each bug, we know exactly when it should have been fixed, in what file(s) and what version.

83 open Divvun/Disamb bugs (45 of these 83 are speller-related bugs, 38 are other bugs), and 23 risten.no bugs

10. Next meeting, closing

The next meeting is 7.1.2008, 09:30 Norwegian time.

The meeting was closed at 13:41.

Appendix - task lists for the next week

Boerre

Ilona

Maaren

Per-Eric

Risten

Saara

Sjur

Thomas

Tomi

Trond