Language Technology at UiT

The Divvun and Giellatekno teams build language technology aimed at minority and indigenous languages

View GiellaLT on GitHub divvungiellatekno/giellalt.uit.no

Meeting setup

Agenda

  1. Opening, agenda review
  2. Reviewing the task list from a week ago
  3. Corpus gathering
  4. Corpus infrastructure
  5. Linguistics
  6. risten.no
  7. Other issues
    1. News on Univ. proj. positions
    2. UNESCO project info
    3. Xerox contract
    4. CVS Mailing
    5. Helsinki gathering
  8. Summary, task lists
  9. Closing

1. Opening, agenda review, participants

Opened at 10.00. Agenda accepted with some additions under “Other”

Present: Sjur, Trond, Tomi

Absent: Børre, Maaren, Thomas

Main secretary: Tomi

2. Reviewing the task list from the last meeting

Maaren

Sjur

Thomas

On vacation last week

Børre

Tomi

Trond

3. Corpus gathering

See notes above for the New Testamente (under Trond)

4. Corpus infrastructure

Directory names not optimal. Presently we have:

sme/orig/
   int/
   gt/

So far so good. But internal in each of these, the names and categorization are not optimal.

catxml: updated to include xml tags in the output, if so specified. To be able to keep (or restore) the xml tags after linguistic analysis.

5. Linguistics

sme

See above (compounds).

smj

See above (bugs).

6. risten.no

Sjur will continue to use some time on the following issues:

7. Other issues

News on University project positions

UNESCO project info

CVS Mailing

Does not seem to be working for/reaching all of us. Sjur will follow up with Steinar Trædal-Henden.

Helsinki gathering

Dates

Thomas did not want to go earlier. We extend the meeting with a technical day on Monday, and all of us on Tuesday. Thomas can then travel on Monday, as originally planned.

Demo

We still need confirmation on the Xerox tools (whether they will be available in time), and whether we will get a slot/table for the demo. Sjur will keep all informed.

8. Summary, task list

Sjur

Tomi

Trond

On vacation

Tasks are transferred to the following weeks until they return from vacation, to keep the tasks alive and updated till after vacation. New tasks may be added:-)

Børre

Maaren

Thomas

9. Next meeting, closing

18.07.2005 10:00

Closed at 12:40