Language Technology at UiT

The Divvun and Giellatekno teams build language technology aimed at minority and indigenous languages

View GiellaLT on GitHub divvungiellatekno/giellalt.uit.no

Meeting setup

Agenda

  1. Opening, agenda review
  2. Reviewing the task list from last week
  3. Documentation - divvun.no
  4. Corpus gathering
  5. Corpus infrastructure
  6. Infrastructure
  7. Linguistics
  8. name lexicon infrastructure
  9. Spellers
  10. Other issues
  11. Summary, task lists
  12. Closing

1. Opening, agenda review, participants

Opened at 09:37.

Present: Børre, Per-Eric, Risten, Sjur, Thomas, Tomi, Trond

Absent: none

Agenda accepted as is.

2. Updated task status since last meeting

Børre

Ilona

Maaren

Per-Eric

Saara

Sjur

Thomas

Tomi

Trond

3. Documentation

TODO:

4. Corpus gathering

TODO:

5. Corpus infrastructure

Nothing.

6. Infrastructure

Speller testing is still fluctuating a bit.

7. Linguistics

North Sámi

Čorru > čorut
*Oslolaš with hyphen required, is printed now, but shouldn't
oslolaš - is done correctly now

TODO:

Lule Sámi

We have the same oslolaš derivation in smj too, but with another derivation.

Tjårro > tjårok
*Oslolaš with hyphen required, is printed now, but shouldn't
oslolaš - is done correctly now

smj propernoun bug issue: procedure

  1. convert from common base (which means sme base)
    1. Words not convertable should be added to separate smj lexicon, and words that should not be converted from sme sme should be moved to non-convert lexicon in sme???
  2. send to smj morphology

The original todo was to correct the smj morphology. Current test shows weaknesses in both camps:

Testing procedures:

Suggestion: Let us first analyse the proper noun base forms for Lule Sámi, and thereafter look at the morphology.

TODO:

8. Name lexicon infrastructure

This sub-project needs to get up and running soon. Mainly Sjur’s task.

Decisions made in Tromsø can be found in [this meeting memo.|/admin/physical_meetings/tromso-2006-08-propnoun.html]

TODO:

  1. fix bugs in lexc2xml; add comments to the log element (Saara)
  2. finish first version of the editing (Sjur)
  3. test editing of the xml files. If ok, then: (Sjur, Thomas, Trond)
  4. make terms-smX.xml <=== automatically from propernoun-sme-lex.xml (add nob as well) (the morphological section should be kept intact, in e.g. propernoun-sme-morph.txt) (Sjur, Saara)
  5. convert propernoun-($lang)-lex.txt to a derived file from common xml files (Sjur, Tomi, Saara)
  6. implement data synchronisation between risten.no and the cvs repo, and possibly other servers (ie the G5 as an alternative server to the public risten.no - it might be faster and better suited than the official one; also local installations could be treated the same way)
  7. start to use the xml file as source file
  8. clean terms-sme.xml such that all names have the correct tag for their use (e.g. @type=secondary) (Thomas, Maaren, linguists)
  9. merge placenames which are errouneously in different entries: e.g. Helsinki, Helsingfors, Helsset (linguists)
  10. publish the name lexicon on risten.no (Sjur)
  11. add missing parallel names for placenames (linguists)
  12. add informative links between first names like Niillas and Nils (linguists)

9. Spellers

OOo spellers

We have a first working demo!

TODO:

Testing

Spelling Error Markup

TODO:

Automated testing

The infrastructure still fluctuating a bit.

TODO:

Lexicon conversion to the PLX format

All bugs fixed.

The latest changes to the Makefile should be reviewed after the lexicon bug we found last week. If possible, it should be reverted to the state before, to restore true dependencies, and most processing on the local computer (ie G5, and later XServe).

TODO:

New public beta

We are ready to deliver one now. What needs to be done:

TODO:

10. Other

Corpus contracts

Delayed till after final release.

TODO:

Bug fixing

When fixing bugs, record the version number containing the fix in the Bugzilla bug report, such that for each bug, we know exactly when it should have been fixed, in what file(s) and what version.

62 open Divvun/Disamb bugs (32 of these 56 are speller-related bugs, 30 are general bugs), and 23 risten.no bugs

11. Next meeting, closing

The next meeting is 8.10.2007, 09:30 Norwegian time.

The meeting was closed at 10:26.

Appendix - task lists for the next week

Boerre

Ilona

Maaren

Per-Eric

Risten

Saara

Sjur

Thomas

Tomi

Trond